NAU INTERNATIONAL PAVILION Deemed a "building of the future," Northern Arizona University's (NAU) International Pavilion earned the coveted President's Award (Best of Show) and the Crescordia Award in the 36th Annual...
YAVAPAI COLLEGE BUILDING RENOVATIONSKCS completed a total of 65,997 SF of renovations to five buildings simultaneously following an aggressive summer construction schedule. The buildings underwent major interior renovations...
NAU UNION DINING HALL EXPANSION PHASE I The two-story, 23,143 SF addition ties into the existing Northern Arizona University Union on central campus. The award-winning facility provides customized food vendor platforms, a Starbucks,...
NAU UNION DINING HALL EXPANSION PHASE IIKCS served as Design-Build Contractor for this project. The scope of work included a 10,096 SF addition and 2,000 SF of renovations to the existing hotspot. The new addition includes a new Starbucks,...
DESERT STAR COMMUNITY SCHOOL EXPANSION & RENOVATIONKCS completed a new addition to the Desert Star Community School in Cornville, AZ. The addition includes a 6,332 SF multi-purpose building, new crafts classroom, new septic system, upgraded...
YAVAPAI COLLEGE BUILDING L ADDITION & RENOVATIONS KCS served as CMAR to complete 2,000 SF in new construction and 20,050 SF in renovations. The new two-story building design included enclosing existing exterior hallways and adding conditioned...
SEDONA-OAK CREEK USD PV SYSTEM This project includes the design and installation of an 806 kW DC, ground-mounted, non-tracking, grid-tied, photovoltaic electric system. By successfully securing Up Front Incentives (UFI)...
PAYSON USD PV SYSTEM KCS rose to the challenge of installing a combined 1.45 MW DC, grid-tied, solar photovoltaic system at three different campus sites in nine weeks. A total of 5,993 photovoltaic modules...
NAU ATHLETICS & RECREATION COMPLEX INFRASTRUCTURENAU's new complex features a 50-meter, 10-lane Olympic-sized pool, and a 10-meter dive tower and dive well, and provides an on-campus home for men’s and women’s tennis teams with...
NAU GREENING THE QUAD & PEDWAY IMPROVEMENTS KCS completed extensive renovations to portions of the existing primary pedestrian/bicycle pedway and created green spaces for the University community, including the restoration of the historic...
YAVAPAI COLLEGE UTILITY DISTRIBUTIONKCS completed campus-wide utility work on the Verde Valley Campus of Yavapai College. The scope of work included the installation of: · Over 3,000 LF of underground insulated chilled...
NAU LIBERAL ARTS RENOVATION This project consisted of approximately 61,532 SF of fire, life, safety, and energy efficiency renovations. Building Information Modeling (BIM) was utilized in coordinating the mechanical,...
SEDONA-OAK CREEK USD DISTRICT OFFICE PV SYSTEM KCS led project efforts for the design and installation of a 41 kW DC, grid-tied photovoltaic system for Sedona-Oak Creek Unified School District. Built with 100% local subcontractor...
NAU PV SYSTEM KCS served as Civil Contractor for the NAU Photovoltaic System project. Subsurface rock was encountered shortly into construction and required the import of over 15,000 CY of material. ...
NAU LABORATORY FACILITYKCS was able to integrate the historical district of north campus with what will become Northern Arizona University’s Science Complex — a gateway from the past to the future. ...
YAVAPAI COLLEGE RECLAIMED WATERLINELocated on Yavapai College’s Verde Valley Campus in Clarkdale, Arizona, the new line supplies reclaimed water to the College’s new Southwest Wine Center. KCS installed approximately...
STAR SCHOOL MULTIPURPOSE BUILDINGThe new multipurpose building contains additional classrooms, gymnasium, performance stage, cafeteria, restrooms, and a kitchen. Located four miles from the Navajo Indian Reservation, the...
ASH FORK JOINT USD ATHLETIC FIELD This project consisted of the construction of one football/soccer combination field, one baseball field, and one softball field. All new fields utilized REALGRASS™ artificial turf. ...
NAU NORTH VALLEY CAMPUS TENANT IMPROVEMENTS This project consisted of 40,610 SF of tenant improvements at the North Valley Campus in Phoenix, Arizona. A flexible, multipurpose space concept was utilized to fully transform the facility...
NAU EXTENDED CAMPUSES FACILITY INFRASTRUCTURE Kinney Construction completed all construction efforts while keeping the facility fully operational, including the relocation of satellite dishes and communication towers; re-routing of fiber...
WILLIAMS USD DEFICIENCY CORRECTIONS This project included both new construction and renovation work. The new construction scope of work consisted of an 8,500 SF vocational education building and a 3,500 SF cafeteria building. ...
NATIVE AMERICAN CULTURAL CENTER INFRASTRUCTURE Kinney Construction completed the earthwork and site utilities for the new Cultural Center. The existing soils required mitigation in the form of 10,000 CY of over-excavation, haul-off,...
PAYSON USD PV SYSTEM INFRASTRUCTURE Facing a compressed schedule, Kinney Construction installed over 7,000 LF of conduit at three different campuses in less than four weeks. Working in close contact with the owners and engineers,...
SEDONA-OAK CREEK USD PV SYSTEM INFRASTRUCTURE Kinney Construction completed the infrastructure necessary to support three separate photovoltaic arrays in Sedona, Arizona. The high densities of sandstone required special rock removal...
DINE SOUTHWEST HIGH SCHOOL VISUAL ARTS CLASSROOM Located in Seba Dalkai on the Navajo Indian Reservation, DINE Southwest High School is a charter high school that serves students from the Navajo Nation. The 6,000 SF, stand-alone...
NAU EXTENDED CAMPUSES FACILITYKCS added an additional 24,812 SF to the NAU Communications Building. This new, LEED Gold Certified building has classrooms, faculty offices, and a new television studio. Renovations were...
NAU PV SYSTEM INFRASTRUCTURE For this project, subsurface rock was encountered shortly into construction and required an adjustment to the approach. A value analysis revealed that importing fill using excess material...
NAU TINSLEY HALL RENOVATION This project consisted of pre-construction and construction services for the renovation of Tinsley Hall, a 90,000 SF student residence hall with 270 rooms located centrally on NAU’s Flagstaff campus.
MOHAVE COMMUNITY COLLEGE MULTI-PURPOSE FACILITY Mohave Community College is a comprehensive community college in Kingman, Arizona that serves more than 13,000 students each year across Arizona, California, Nevada, and Utah. KCS served...
NAU COWDEN HALL RENOVATION KCS is currently serving as CMAR for Northern Arizona University’s (NAU) Cowden Hall Renovation. This project includes three new custom mechanical packages, renovations to public...
YAVAPAI COLLEGE CAPITAL IMPROVEMENTS AND PREVENTATIVE MAINTENANCE PROGRAM KCS is currently serving as CMAR for Yavapai College's FY19-22 Capital Improvements and Preventative Maintenance Program. This program consists of numerous vertical and horizontal projects...
BLVD 1900 CLUBHOUSE RENOVATION This project consisted of the interior demolition and rebuild of a three-story student housing facility clubhouse in Tempe, Arizona serving Arizona State University (ASU) students. Scope...
NAU WEST UNION LAWN PHASES I & II Phase I of this NAU JOC project consisted of removal of the existing sod and installation of 140 LF of 18” HDPE storm drain, 60 LF of six-inch concrete sidewalk, 48 LF of concrete curbs...