KCS served as Civil Contractor for the NAU Photovoltaic System project. Subsurface rock was encountered shortly into construction and required the import of over 15,000 CY of material. NAU expanded our scope of work to include the installation of underground conduit, pull boxes, duct banks, and a high-voltage switch. Upon completion of KCS’ contracted scope of work, APS contracted out the installation of a 165 kW DC photovoltaic system, which consisted of 798 SHARP Poly-Crystalline Silicon 208 watt panels.
Size: 165 kW
Owner: Northern Arizona University