LAKE HAVASU CITY HAVASU RIVIERA STREET & UTILITY IMPROVEMENTS
KCS Civil served as Prime Civil Contractor for Lake Havasu City's Havasu Riviera Street & Utility Improvements project. The project consisted of site development connecting two future developments: Havasu Riviera Arizona State Park and Havasu Riviera Residential Community.
Scope included:
- Installation of 8,555 LF of 12" PVC waterline
- Installation of 355 LF of 12" DIP water main
- Installation of 13 fire hydrant assemblies
- Installation of valves, bends, air/vac valves and associated pipeline appurtenances
- Hot tap of existing 27" CCP water main
- Backup power generation
- Sewer lift station and SCADA
- Odor control system
- Security/screen wall and gates
- Installation of 31,300 SY of four-inch asphalt roadway
- Installation of 11,075 LF of concrete curb and gutter
- Sawcutting and pavement removal
- Installation of 26,765 SF of concrete sidewalk
- Installation of 293 LF of 18" HDPE drainage pipe
- Installation of 255 LF of 24" HDPE drainage pipe
- Catch basins, riprap, and retaining walls
- Installation of thirteen (13) 48" manholes
Owner: Lake Havasu City
Role: Prime Civil Contractor