Industries

NAIPTA VERDE VALLEY TRANSIT FACILITY

KCS constructed a 2,281 SF operations center, bus-wash pad, 927 SF garage maintenance bay, 13,500 SF shade structure, and 5,880 SY asphalted concrete parking lot.  KCS self-performed all earthwork and underground utilities. Green building strategies utilized include:

  • Elimination of floor coverings by utilizing exposed concrete
  • Low VOC-emitting products and materials
  • Photovoltaic panels mounted on the vehicular shade structure

Size: 3,208 SF
Owner: Northern Arizona Intergovernmental Public Transportation Authority (NAIPTA)
Role:
Design-Build Contractor

 

Copyright © 2024 Kinney Construction Services. All Rights Reserved