Portfolio

THE TRAX PHASE I SITE DEVELOPMENT

This project included new site development for Sportsman’s Warehouse and other retail sites. The project involved working within the boundaries of ADOT, BNSF Railroad, and...

FT. TUTHILL COUNTY PARK IMPROVEMENTS

KCS completed extensive renovations to the Ft. Tuthill County Fairgrounds facility.  Scope included resurfacing the entire quad; new lime stabilization of existing soils; installation of...

REHABILITATION HOSPITAL INFRASTRUCTURE

The Rehabilitation Hospital in Flagstaff provides rehabilitation services to people recovering from diseases or injuries.  KCS Civil self-performed the civil site work and infrastructure...

HILLSIDE VISTA ESTATES INFRASTRUCTURE

The Hillside Vista Estates Infrastructure project in Sedona, AZ includes site development for a 30-lot housing development. Scope includes construction of a road through the development; drainage;...

FEDEX RELAY YARD AND BREAKROOM

This project includes construction of a freight relay yard and preparation for a breakroom trailer. Scope includes mass earthwork, placement of 38,000 TN of aggregate base, asphalt paving and...

RESIDENCE INN SEDONA INFRASTRUCTURE

The Residence Inn Sedona is a new, 92-room, 66,318 SF hotel located in West Sedona, AZ.  Serving as Civil Subcontractor, KCS Civil completed mass excavation and site grading, building pad...

YAVAPAI COLLEGE UTILITY DISTRIBUTION

KCS completed campus-wide utility work on the Verde Valley Campus of Yavapai College.  The scope of work included the installation of: · Over 3,000 LF of underground insulated chilled...

OAK CREEK WATERLINE, RESERVOIR & PIPELINE

This project included the installation of 1,000 LF of new, eight-inch waterline stretching up a 60% slope to connect an existing water tank to the Sedona airport at the top of Table Top Mountain. ...

CITY OF COTTONWOOD UNDERGROUND JOC

KCS is currently serving as a JOC Contractor for the City of Cottonwood's JOC for Underground Contracting Program. Individual projects are valued at or under $250,000 and involve water and wastewater...

CITY OF FLAGSTAFF DRAINAGE IMPROVEMENTS

Located at 10+ sites throughout the City, these projects improved severe drainage issues by adding new piping, drainage structures, walls, and landscaping.  The drainage improvement projects...

YAVAPAI COLLEGE RECLAIMED WATERLINE

Located on Yavapai College’s Verde Valley Campus in Clarkdale, Arizona, the new line supplies reclaimed water to the College’s new Southwest Wine Center.  KCS installed approximately...

ASH FORK JOINT USD ATHLETIC FIELD

This project consisted of the construction of one football/soccer combination field, one baseball field, and one softball field.  All new fields utilized REALGRASS™ artificial turf. ...

HIGHLANDS FIRE STATIONS INFRASTRUCTURE

Construction efforts consisted of site grading, building pad, significant underground utilities, and drainage structures.  Over 2,500 LF of eight-inch water line was installed at Fire Station No.

LOCI 66 PARKING LOT EXPANSION

The new parking lots, truck access, and loading docks constructed by Kinney Construction vastly improved vehicular access and flow to the existing 90,000 SF building.  Extensive rock...

NAU PV SYSTEM INFRASTRUCTURE

For this project, subsurface rock was encountered shortly into construction and required an adjustment to the approach.  A value analysis revealed that importing fill using excess material...

PAYSON USD PV SYSTEM INFRASTRUCTURE

Facing a compressed schedule, Kinney Construction installed over 7,000 LF of conduit at three different campuses in less than four weeks.  Working in close contact with the owners and engineers,...

SAWMILL COUNTY PARK

KCS transformed a 2.5 acre, inert dumpsite into a multi-use neighborhood park with environmental sustainability and local art inspiration.  The park consists of picnic ramadas, amphitheater,...

APS SOLDIER'S TRAIL SUBSTATION

This new substation provides power to the surrounding Flagstaff area including future development at Pulliam Airport.  Scope of work included construction of a new substation access road;...

KOCH FIELD ROAD WIDENING & CAPE SEAL

The scope included pavement maintenance and drainage improvements along 6,450 LF of Koch Field Road with utility relocations.  The project required extensive utility coordination in order...

NAU WEST UNION LAWN PHASES I & II

Phase I of this NAU JOC project consisted of removal of the existing sod and installation of 140 LF of 18” HDPE storm drain, 60 LF of six-inch concrete sidewalk, 48 LF of concrete curbs...

LA QUINTA INN FLAGSTAFF SITE WORK

KCS Civil was selected to complete site work for the new La Quinta Inn Flagstaff located at the intersection of Huntington Drive and Lucky Lane.  Scope of work included mass earthwork and...

STATE ROUTE 69 WATERLINE RELOCATION

KCS Civil installed 1,265 LF of 12” PVC waterline along the south side of State Route 69, as well as removed and replaced 1,355 SF of pavement and 10 LF of curb and gutter for the Town...

Copyright © 2023 Kinney Construction Services. All Rights Reserved