OAK CREEK WATERLINE, RESERVOIR & PIPELINE

This project included the installation of 1,000 LF of new, eight-inch waterline stretching up a 60% slope to connect an existing water tank to the Sedona airport at the top of Table Top Mountain.  With only 20 feet of easement available to work within on the steep slope, KCS made safety and site logistics top priorities.  The project also included the installation of the following: 270 LF of ductile iron piping; a new, 16 foot high, steel-bolted water reservoir; and 400 LF of six-inch waterline. 

Owner: Oak Creek Water Company No. 1
Role: Prime Civil Contractor