This new substation provides power to the surrounding Flagstaff area including future development at Pulliam Airport. Scope of work included construction of a new substation access road; tie-in to existing conduits; 1,165 CY of earthwork cut and fill; installation of 2,029 LF of electrical duct banks, 18 concrete pad foundations, 37 lally column foundations, 4,331 SY of six-inch ABC substation surface, and 1,566 SY of eight-inch ABC access drive; and construction of 781 LF of perimeter CMU wall with stone veneer. Kinney self-performed all civil scopes of work and coordinated closely with the City of Flagstaff, ADOT, and Coconino County.
This new substation provides power to the surrounding Flagstaff area including future development at Pulliam Airport. Scope of work included construction of a new substation access road; tie-in to existing conduits; 1,165 CY of earthwork cut and fill; installation of 2,029 LF of electrical duct banks, 18 concrete pad foundations, 37 lally column foundations, 4,331 SY of six-inch ABC substation surface, and 1,566 SY of eight-inch ABC access drive; and construction of 781 LF of perimeter CMU wall with stone veneer. Kinney self-performed all civil scopes of work and coordinated closely with the City of Flagstaff, ADOT, and Coconino County.