Coconino County North Schultz Flood Repair

Kinney installed extensive flood mitigation infrastructure along Brandis Way that included 1,226 CY of flood channel excavation, grading, and reconstruction; 2,911 SY of hydroseeding; and installation of 2,911 SY of turf reinforcement mats (TRM) and 617 CY of shotcrete (concrete). The project restored the flood channel along the northern part of the Schultz Flood area that was impacted by an extreme monsoon rain event.

Coconino County North Schultz Flood Repair

Kinney installed extensive flood mitigation infrastructure along Brandis Way that included 1,226 CY of flood channel excavation, grading, and reconstruction; 2,911 SY of hydroseeding; and installation of 2,911 SY of turf reinforcement mats (TRM) and 617 CY of shotcrete (concrete). The project restored the flood channel along the northern part of the Schultz Flood area that was impacted by an extreme monsoon rain event.