Contact us about a career at Kinney Construction Services

Dilkon Water Tower

This project involved the construction of a state-of-the-art 300,000-gallon welded steel elevated water storage reservoir, designed to enhance water supply and distribution in the region. Key components of the project included 10-in water main (944 lf), 4-inch and 10-inch DI piping. Meter, pressure reducing and back flow assemblies, fencing, site improvements, interior piping, valves, ultrasonic meter, circulation pump, level controls., electrical facilities, and fiberglass shelter.

Dilkon Water Tower

This project involved the construction of a state-of-the-art 300,000-gallon welded steel elevated water storage reservoir, designed to enhance water supply and distribution in the region. Key components of the project included 10-in water main (944 lf), 4-inch and 10-inch DI piping. Meter, pressure reducing and back flow assemblies, fencing, site improvements, interior piping, valves, ultrasonic meter, circulation pump, level controls., electrical facilities, and fiberglass shelter.

Scroll to Top