Sedona Wastewater Reclamation Plant PV System
- MARKET:
- Municipal
- DELIVERY METHOD:
- General Contractor
- SIZE:
- 661 kW DC
- OWNER:
- City of Sedona
Serving as General Contractor and Civil Subcontractor, Kinney worked closely with SunEdison and the City of Sedona to install a 661 kW DC photovoltaic system at the City of Sedona Wastewater Reclamation Plant. The City contracted direct with SunEdision through a Power Purchase Agreement (PPA) and the team successfully secured Production Based Incentives (PBI) through Arizona Public Service (APS). The photovoltaic system’s racking system is a pile-mounted, fixed-rack tilt system. Kinney installed a total of 2,448 MEMC P270AMA QC and BizLink mixed-use generation one and generation two modules. Kinney self-performed all site work scopes of work.
Sedona Wastewater Reclamation Plant PV System
- MARKET:
- Municipal
- DELIVERY METHOD:
- General Contractor
- SIZE:
- 661 kW DC
- OWNER:
- City of Sedona
Serving as General Contractor and Civil Subcontractor, Kinney worked closely with SunEdison and the City of Sedona to install a 661 kW DC photovoltaic system at the City of Sedona Wastewater Reclamation Plant. The City contracted direct with SunEdision through a Power Purchase Agreement (PPA) and the team successfully secured Production Based Incentives (PBI) through Arizona Public Service (APS). The photovoltaic system’s racking system is a pile-mounted, fixed-rack tilt system. Kinney installed a total of 2,448 MEMC P270AMA QC and BizLink mixed-use generation one and generation two modules. Kinney self-performed all site work scopes of work.