Sedona Wastewater Reclamation Plant PV System

Serving as General Contractor and Civil Subcontractor, Kinney worked closely with SunEdison and the City of Sedona to install a 661 kW DC photovoltaic system at the City of Sedona Wastewater Reclamation Plant. The City contracted direct with SunEdision through a Power Purchase Agreement (PPA) and the team successfully secured Production Based Incentives (PBI) through Arizona Public Service (APS). The photovoltaic system’s racking system is a pile-mounted, fixed-rack tilt system. Kinney installed a total of 2,448 MEMC P270AMA QC and BizLink mixed-use generation one and generation two modules. Kinney self-performed all site work scopes of work.

Sedona Wastewater Reclamation Plant PV System

Serving as General Contractor and Civil Subcontractor, Kinney worked closely with SunEdison and the City of Sedona to install a 661 kW DC photovoltaic system at the City of Sedona Wastewater Reclamation Plant. The City contracted direct with SunEdision through a Power Purchase Agreement (PPA) and the team successfully secured Production Based Incentives (PBI) through Arizona Public Service (APS). The photovoltaic system’s racking system is a pile-mounted, fixed-rack tilt system. Kinney installed a total of 2,448 MEMC P270AMA QC and BizLink mixed-use generation one and generation two modules. Kinney self-performed all site work scopes of work.

Scroll to Top