Kinney completed sewer improvements for W.L. Gore’s Fisher Point location in Flagstaff, AZ that included sewer line upgrades and a new lift station.
Scope included:
88 LF of 6” PVC gravity sewer line;
40 LF of 3” DIP pressure sewer line;
423 SF of 4” concrete on top of 4” aggregate base;
96” precast wet well with two submersible pumps;
354 SF of CMU block wall; and
A metal above-ground instrumentation enclosure.
Kinney completed sewer improvements for W.L. Gore’s Fisher Point location in Flagstaff, AZ that included sewer line upgrades and a new lift station.
Scope included:
88 LF of 6” PVC gravity sewer line;
40 LF of 3” DIP pressure sewer line;
423 SF of 4” concrete on top of 4” aggregate base;
96” precast wet well with two submersible pumps;
354 SF of CMU block wall; and
A metal above-ground instrumentation enclosure.